Reports

Drive 0 reports

In December 2023, the Drive 0 project approached the end of its 51-month journey. However, before closing the project, the consortium organised the final symposium and clustering workshop on 15th November 2023 in Brussels. This full-day, in-person event brought together around 60 participants – representatives of relevant EU H2020 and LIFE projects & stakeholders from Brussels’ diverse sectors: EU institutions working in the field of policy, construction, architecture, energy, manufacturing, social housing, property owners’ associations etc. The event titled: ‘Fostering experiences from EU innovation projects to accelerate a sustainable built environment’ was organised in collaboration with Drive 0 sister projects: PLURAL, GigaRegioFactory, STEP-UP, INFINITE, BuildUPspeed. The aim was to reflect together with these other relevant EU projects on the profound impact of the developed innovative construction and renovation solutions drawing insights from experiences on the ground. The event explored emerging trends like prefabrication, circularity, off-site construction, modularization, digitalization, and industrialisation.

You are invited to read the impressive report summarising important discussions that took place throughout the symposium here: LINK.

You can find the Final Publishable report on the following link: LINK.  

 

For a more detailed overview of the described results please find comprehensive reports related to each work package below:  

DateName of the reportPresentation summary (2 slides)Full reportOther links 
     

Dec 2019

Drive 0 project visual design

 LINK

 

Dec 2019

Website

 LINK

 

Mar 2020

Report on benchmarking on circularity and its potential on the demo sitesLINKLINK

Video

 

Mar 2020 (updated in July 2021 and March 2022)

 

Dissemination and Communication Plan 

 LINK

 

Nov 2020

Report on the assessment available product and technology developments, benchmarking and selection of most favourable and most potential solutions for further development to circular renovation products and a list of criteria/KPI’s

 LINK

 

Dec 2020

Monitoring Protocol

 LINK

 

May 2021Report with a description of the boundary conditions of an enhanced circular renovation process LINK

 

Jul 2021Collection of monitoring technologies, methodologies and information services LINK

 

Aug 2021Tailor-made holistic and circular renovation packages for the 7 demonstration cases LINK

 

Sep 2021Report on the business models employed in each case study LINK

 

Nov 2021

Driving decarbonization of the EU building stock (article)

 LINK

 

Mar 2022

Development of a morphological design approach and guidelines for circular renovation

 LINK

 

Mar 2022

Detailed Monitoring Action Plans for each demonstration case

 LINK

 

Apr 2022

A Set of circular prefab 3D case-specific solutions

 LINK

Video

May 2022

User centred information service description

 LINK

 

Jun 2022

Report and feedback loops of the tests in step 1

 LINK 
Feb 2023

A set of  circular prefab 2D building envelop elements with case specific solutions

 LINK 
Feb 2023

Development of circular modular prefab building platforms

 LINK 
Feb 2023

A set of smart building and installation details for mounting and demounting

 LINK

 

May 2023

Report on attractive and understandable user information

LINKLINK

 

May 2023

Report on the experimental/lab results on consumers/users behavior and social responsibility

LINKLINK

 

Sep 2023

Numerical code for the construction of the Circular Readiness Indicator

LINKLINK

Excel code

Oct 2023

Blueprints for BIM-controlled automated production lines for circular renovation products

LINKLINK

 

Jan 2024

(3.5) Catalogue with circular concepts: the EU circular renovation atlas

LINKLINK 
Jan 2024

(5.5) Booklet with policy recommendations

LINKLINKLINK
Jan 2024

(6.4) Smart impact measuring & feedback from study and demonstration cases

LINKLINK 
Jan 2024

(6.5) Evaluation of the performances of the deployed renovation solutions, tools and information services

LINKLINK 
Jan 2024

(6.7) Evaluation of the impact of local drivers to trigger deep renovation

LINKLINK 
Jan 2024(5.4) Three webinars for ACE, HE and UIPI for a market uptake of the business model and one collateral capacity event on application LINK 
Jan 2024(6.6) Report on the effectiveness of the business modelsLINKLINK